rms + sainik Class VI entrance exam Model paper Mathematics
ssb coaching+ sainik + Rms Coaching academy
call 094437 20076
www.ssbcoaching.com
Q.7 Answer:
call 094437 20076
www.ssbcoaching.com
is maths Tough?
Start with mental Maths:
Decimals:
1. Add:
9.00009 +1.025
2. Multiply:
0.33x 0.007
3. Divide: 8.991
Divided by 0.09
4. Subtract:
97.002 – 1.00009
5. HCF of
84, 12, and 32 =?
6. L.C.M of
121, 222, and 333 is =?
7.
Find the cost of 12 ½ dozen, if 4 items cost Rs.24
8.
A boy cycles at a speed off 15 m/s what is the distance covered by him in 2 ½
hours?
9. Convert: 1111 minutes into hours
10. Find the % of loss or
gain when an item was purchased for Rs.80, a repair of Rs.10 was done and
packing charges was Rs.10. If his
Selling price was Rs.7.50 more than CP.
Section- II
11. Find the number of tiles required to cover the entire
floor of 8 m long and 4 m broad, if the measurement of the tile is 16 cm and 8
cm
12. Find the Amount earned on an investment of Rs. 8765
invested for 146 days at 12.5 % SI
13. A cycle tyre has a diameter of 42 cm, if it makes 2000
rotation. How many km will it travel?
14. Find the length of a train in metres, if the train
crosses a pole in 12 sec and its speed was 72 km/ hr.
15. If A can do a job in 10 days, and B can do the same job
in 5 days. How long will they be able to complete a job if they work together
on a job that was done by B alone in 40 days?
16. A boat travels
at a speed on 10 km/ hr. in Still water.
If it travels a distance of 10 km against the current on a river and takes 1 hour and 15 min. find the speed of the
water current.
17. A shooter
can shoot 9 on the target out of 10.
What will be the accuracy in percentage if he shoots at the same rate of
180 targets?
18. A man is
Four times the age of his son on the son’s 10th birthday, what will be their
ratio of the age during the son’s 15th birth day?
19. Find the
cost of covering the floor at Rs. 25 per
sq m of the path that runs both horizontal and Parallel to a plot of 40 m
length and 30 m broad. The width of the path is 2.5 m.
20. If two men work for 8 hours each per day,and took 40 days to complete the job, how long will one man taking 12 hour a day will take to complete the same job?
Q.1 Answer: 10.02509
Q.2. Answer: 0.00231
Q.3 Answer: 99.9
Q.4. Answer: 96.00191
Q,5, Answer: 4
Q.6.Answer Answer: 90586
Q.7 Answer:
Cost one items = 24/ 4 = 6 and hence
150 x 6 = Rs.900
Q,8. Answer:
135 km distance covered
Q.9. Answer: 18. 52 hours
Q.10.
Answer: Profit 7.5 %
Answer to Q. 11
8 x 4 x 100 x
100 / 16 x 8
8 x 4 x 10000.
/ 16 x 8 =
10000/4 = 2500
tiles
Q.12. Rs. 43.85
+8765 = Rs. 8808.85 amount
Q.13. dia 42
cm. circumference is 22/ 7 x d. 22/ 7
x 42 = 22 x 6 =132 cm
2000 x 132 = 254000 / 1000 = 25. 4 km in 2000
rotations.
Q.14. speed 72
m this in m/s = 72000 / 3600 = 20 m/s
In 12s =
distance traveled in the length of the train is 12 x 20 = 240 m answer
Q.15. A can do
a job in 10 days and B is 5 days
ie. A can do the some 2 and B 1
Both together
can do 1.5 job in one day
B does in 40
days . hence a will do the same job in double time so
40 + 80 = ¼ + 1/ 8
lcm 8
2+
1 / 8 = 3/ 8 in one day
Hence
40 x 3/ 8 = 5x 3 = 15 days answer.
Comments
Post a Comment