Afcat revision Test 2015
AFCAT - Test 02- 2015 Compiled by www.ssbcoaching.com for coaching and SSB call 094437 20076 1. In a platform, train "A" 25m. long is stopped to allow train "B" 375 m long to pass. Speed of "C" is 90 km per hour. Time taken by train "B" to cross train "A" completely will be____ a) 6.67 seconds b) 9 sec c) 2.5 sec d) 24 sec 2. The sum of all those prime numbers which are not greater than 17 is____ a) 59 b) 58 c) 41 d) 42 3. A can do 1/6 of a work in 5 days, b can do 2/5 of the work in 8 days. In how many days, can both A and B together complet the work a) 12 days b) 13 days c) 15 days d) 20 days 4. The simplified value of √ 0.25 x 2.25 is a) 0.075 b) 0.705 c) 0.750 d) 7.500 5. A milk vendor has 21 litres cow's milk, 42 litres of toned milk, and 63 l